GE GL317D Instruction Manual page 213

Sf6 circuit- breaker
Table of Contents

Advertisement

Grid Solutions
CAUSE OR ORIGIN OF HAZARD.
Our equipment includes gas pressure assemblies (SF
WORK REQUIREMENTS.
 Comply with the storage, transport and operating instructions supplied with our equipment.
 Before initial filling and pressurizing, check the overall condition of the shielding concerned :
-
no signs of impact, splitting or chipping on the porcelain components, etc.,
-
no visible damage to hoses and/or rigid pipes (cuts, folds, corrosion, etc.) or to fittings and metal
protection (accumulators, tank, etc.).
SAFETY INSTRUCTIONS.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, all work on pressurized equipment must be carried out by qualified personnel.
PS 0003EN
04
Sheet N°
Revision
SAFETY SHEET
PRESSURIZED EQUIPMENT
G. BERNARD
1998-08-12
Written by
Date
, nitrogen, air, etc.) or fluids (oil).
6
J. VIAT
Signature Approved by
2011-03-21
Date
Signature Page
1 / 3

Advertisement

Table of Contents
loading

Table of Contents