Huawei SmartLogger1000 User Manual page 43

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
Step
2
3
4
5
6
7
Issue 04 (2013-12-15)
Operation
SmartLogger.
Start the inverter and correctly set the communications parameters
(including Address, and Baudrate) on the monitoring panel.
For details about how to set the communications parameters, refer to
Setting Communications Parameters in the SUN2000 (8KTL-20KTL)
User Manual and SUN8000-500KTL User Manual.
Connect the output terminal of the power adapter for the SmartLogger to
the power port POWER and the input terminal to the AC socket.
Set the search address segment and baud rate for the RS485 port on the
SmartLogger monitoring panel.
If the SmartLogger is powered on for the first time, set the search address
segment and baud rate for the RS485 port in the Wizard, as shown in
Setting Initialization
Parameters. If it is not powered on for the first time,
set the parameters in the Comm. Param. under the Settings, as shown in
6.2.10 Setting Communications
Wait for the SmartLogger to search for inverters. After the search is
completed, the SmartLogger automatically connects to all inverters.
Alternatively, you can skip this operation and manually search for, add, or
delete inverters in follow-up operations. For details, see
Devices.
(Optional) Add the environmental monitoring instrument manually.
For details, see
6.2.14 Managing
NOTICE
Before you add the EMI manually, log in to the WebUI and set related parameters.
For details, see
7.24 Setting EMI
(Optional) Start the PC terminal and set Ethernet and NetEco parameters
on the SmartLogger.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Parameters.
Devices.
Parameters.
5 System Operation
5.2
6.2.14 Managing
36

Advertisement

Table of Contents
loading

Table of Contents