Huawei USG6000 Series Hardware Manual page 196

Unified security gateway
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Unified Security Gateway
Hardware Guide
3.
----End
Follow-up Procedure
Check the following items after the installation is complete:
Issue 03 (2015-01-26)
Push the ejector lever inward until the expansion card is well seated into the slot, and
tighten screws on both sides of the expansion card.
Figure 2-24 Installing a WSIC expansion card
The expansion card is reliably inserted into the slot, and the blots are tightened.
Filler panels are inserted in vacant slots. You must insert filler panels in the vacant slots
on the USG to prevent dust and ensure heat dissipation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Hardware Installation
186

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents