Testing link end hardware

Testing link end hardware
This section describes how to test the link end hardware, either when it fails on startup, or
after a lightning strike.
Before testing link end hardware, confirm that all outdoor drop cables, that is those that
connect the ODU to equipment inside the building, are of the supported type, as defined in
Ordering components
These tests apply to installations that use the PoE power supply. If the PIDU is installed
instead of the PoE power supply, the test procedures will be different.

Testing when PoE LEDs do not illuminate correctly

If the DATA & POWER OUT and DATA IN LEDs do not illuminate correctly during the
start-up sequence, test the link end as described in
detailed test procedures that follow.

Testing after a lightning strike

If the installation has been struck by lightning, proceed as follows:
1
Test the link end as described in
test procedures that follow.
2
Ensure that the PoE power supply is working and that the resistances are
correct as specified in
3
If the ODU is not working, power off the ODU and LPU and return them to
Motorola.
4
If the ODU is working but there is suspicion of damage to the LPU, then refer to
LPU Operational Troubleshooting (phn-1362)
8-2
on page 2-24.
Test resistance in the ODU cable
UNDER DEVELOPMENT
Test flowcharts
Test flowcharts
on page
.
phn-2182_003v004 (Oct 2011)
Chapter 8: Troubleshooting
on page
8-3
and the
8-3
and the detailed
on page 8-10.