Commissioning With The Windows Upnp Service - ABB Busch-Welcome Operating Instructions Manual

Abb busch-welcome ip gateway
Table of Contents

Advertisement

Operating Instructions
®
Busch-Welcome
Pos: 18 /#Neustruktur#/Online-Dokumentation (+KNX)/Überschriften (--> Für alle Dokumente <--)/2. Ebene/G - L/Inbetriebnahme mit dem Windows UPnP-Dienst @ 35\mod_1363612234150_15.docx @ 288582 @ 1222222222222222222 @ 1
5.1

Commissioning with the Windows UPnP service

Pos: 19 /#Neustruktur#/Online-Dokumentation (+KNX)/Erstinbetriebnahme/Busch-Welcome II/Einbindung über UPnP - 83341 @ 35\mod_1363612178713_15.docx @ 288534 @ 22222222222222222222111122222222 @ 1
Preconditions:
There is a DHCP server on the network, e.g. integrated in the router.
The IP gateway is connected to the router by a LAN cable.
The PC is connected to the network.
The IP gateway is connected and ready for operation.
Fig. 1:
Windows UPnP service
1. Open Windows Explorer.
2. Click the "Network" entry below the displayed drives.
The window pane on the right now displays all devices currently on the network.
3. Double-click the IP gateway icon.
A browser window with the configuration interface automatically opens.
Note
If the browser does not open automatically, the device properties appear instead. Copy the
displayed IP address, e.g. 192.168.10.192, and enter it manually into the browser's address bar.
Pos: 20 /#Neustruktur#/Online-Dokumentation (+KNX)/Steuermodule - Online-Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @ 9\mod_1268898668093_0.docx @ 52149 @ 221112222222222 @ 1
Operating Instructions | 1473-1-8354
Start-up
— 8 —

Advertisement

Table of Contents
loading

This manual is also suitable for:

83341-500

Table of Contents