Removing the front cowling assembly
LT
LT
9
10
11
12
4
5
Order
16
Front cowling left inner panel 2
17
Plastic band
18
Plastic holder
19
Handlebar switch coupler
20
Hand shift switch coupler
21
Front cowling wire harness coupler
22
Horn connector
23
Grip warmer coupler
24
Front cowling assembly
8
21
32 Nm (3.2 m
kg, 23 ft
•
24
17
6
3
7
Job/Parts to remove
22
Ib)
•
19
20
23
18
12
2
Q'ty
1
2
Disconnect.
1
Disconnect.
2
Disconnect.
2
Disconnect.
6
Disconnect.
4
Disconnect.
2
Disconnect.
1
For installation, reverse the removal proce-
dure.
– 38 –
GENERAL CHASSIS
10 Nm (1.0 m
kg, 7.2 ft
•
22
21
21
23
9
13
LT
16
11
1
Remarks
Ib)
•
14
14
15