Yamaha 2006 FJR1300AS Service Manual page 35

Table of Contents

Advertisement

1. Spark plug lead #1
2. Spark plug lead #2
3. Front wheel sensor lead
4. Immobilizer unit lead
5. Main switch lead
6. Throttle cable (accelerator cable)
7. Throttle cable (decelerator cable)
8. Brake hose (hydraulic unit to front brake calipers)
9. Brake hose (metering valve to right front brake
caliper)
10. Brake hose (front brake master cylinder to
hydraulic unit)
11. Main fuse
12. Brake light relay
13. Positive battery lead
14. Negative battery lead
15. Fuse box 1 (identified by blue tape on lead)
16. Starter relay
17. Fuse box 2
18. Cylinders-#2/#3 ignition coil connectors (white)
19. Cylinders-#1/#4 ignition coil connectors (black)
20. Spark plug lead #3
21. Coolant temperature sensor
22. Spark plug lead #4
23. Cylinder identification sensor lead
24. O
sensor coupler
2
25. Throttle position sensor
26. Fuel hose
27. Fuel pump/fuel sender lead
28. Crankcase breather hose
29. Stator coil lead
30. Intake air pressure sensor
31. Joint couplers
A. Fasten the immobilizer unit lead and front wheel
sensor lead to the wire harness with a plastic
locking tie, making sure to align the tie with the
white tape on the harness. Face the end of the
plastic locking tie forward. Do not cut off the excess
end of the plastic locking tie.
B. Position the plastic locking tie 0
in) from the end of the protective sleeve of the front
wheel sensor lead.
C. Position the plastic locking tie 10
1.18 in) from the end of the protective sleeve of the
immobilizer unit lead.
D. Route the throttle cables and brake hoses through
the right opening in the frame.
E. Install the immobilizer unit coupler holder so that
the end with the bolt is facing forward.
F. Install the immobilizer unit coupler cover onto the
coupler.
G. Route the wire harness over the spark plug leads.
H. To cylinder identification sensor
I.
To fuel tank
J. Fasten the cylinder identification sensor lead with
the holder on the throttle body.
K. Fasten the fuel pump/fuel sender lead and air
induction system solenoid lead to sub-wire
harness with a plastic locking tie, making sure that
the end of the tie faces forward. Do not cut off the
excess end of the plastic locking tie.
20 mm (0
0.79
30 mm (0.39
– 26 –
CABLE ROUTING
L. Route the stator coil lead to the inside of the
engine bracket (top) and under the crankcase
breather hose.
M. Route the wire harness (to sub-wire harness)
under the fuel hose connector.
N. Route the fuel pump/fuel sender lead under the
fuel hose connector.
O. Place the joint couplers in the area shown in the
illustration, making sure that they do not protrude
above the wire harness.
P. Route the throttle cables over the immobilizer unit
lead, main switch lead, spark plug lead #2, and
wire harness, and under spark plug lead #1.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fjr1300asv2006 fjr1300av

Table of Contents