11/03
First bus node
on
off
Fig. 6-19
Cable Routing
Entry of PROFIBUS cable
from above into electronics
Route bus cable along
available cable line and
fasten it to this line with cable
To pass the cable through,
the bus connector has to be
dismantled
Shield connection
Fig. 6-20
SINAMICS G150
Operating Manual
on
off
Bus terminator
From previous
bus node
Position of the bus terminating resistors
board
ties
Cable routing
Last bus node
on
off
Bus terminator
To next bus node
Operation
6-31