Section 300-Installation
Setting ID No. of Additional Cabinets
Guidelines
• When you add a cabinet to the system, it must be given a cabinet ID number. Each
• Set each cabinet ID number using the ID Rotary Switch as shown in Figure 4-28.
Important Note:
cabled together in series. Cabinets with ID rotary switch settings of 3, 4 and 5
must be cabled together in series. Do not intermix these groups when cabling or
the system may fail to operate.
Figure 4-28. Relationship of rotary switch position/ID number and cabinet
576-13-300
cabinet ID number setting is based upon its cabinet position. See Figure 4-23
through Figure 4-27 for the cabinet positions.
Check that the cabinet ID numbers match the size of the system you are setting
up.
Refer to the following table for the relationship between rotary switch position
and Cabinet ID number when setting the ID number.
Cabinets with ID rotary switch settings 1 and 2 must be
DBS 576 (USA), issued 6/2/98
Chapter 4. - Installing Additional Cabinets
Rotary switch
position/ID
Number
(See Figure 4-23 through
Figure 4-27 for Cabinet
1
2
3
4
5
0, 6 to 9
Cabinet
Position
Positions)
2
3
4
5
6
Not available
4-27