Figure 26. Installed Bracket (View 1)
Install AKD-5 Retrofill Breaker
Ensure only qualified personnel install, operate, service, and maintain all electrical
equipment.
26 EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual
Figure 27. Installed Bracket (View 2)
It must be ensured that the supply power
to the compartment is turned off/
compartment is de-energized for all the
incoming and outgoing circuits of the LVS
prior to any work being conducted on it.
During the installation and related work on
the equipment, it must be ensured that the
operator is using the prescribed PPE for the
specified tasks.
DEH-41547