Installation; Installation Modes; Installation Requirements; Site Selection Requirements - Huawei LUNA2000-200KTL-H1 User Manual

Smart power control system
Table of Contents

Advertisement

LUNA2000-200KTL-H1 Smart Power Control System
User Manual

4.1 Installation Modes

The Smart PCS can be installed on a support, wall, or DC LV Panel (also referred
to as DCBOX).
Table 4-1 Installation modes

Installation

Mode
Wall
mounting
Support
mounting
DCBOX
mounting

4.2 Installation Requirements

4.2.1 Site Selection Requirements

Issue 08 (2024-01-23)
Screw Specifications
M12x60 stainless steel expansion bolt
M12 bolt assembly
-
Do not install the Smart PCS in working or living areas to avoid personal
injury or property loss caused by accidental contact by non-professionals or
other reasons during device operation.
Do not install the Smart PCS in noise-sensitive areas (such as residential
areas, office areas, and schools) to avoid complaints. If the preceding areas
are unavoidable, the distance between the installation position and noise-
sensitive areas must be greater than or equal to 40 m.
If the equipment is installed in a place with abundant vegetation, in addition
to routine weeding, harden the ground underneath the equipment using
cement or gravel (the area shall be greater than or equal to 3 m x 2.5 m).
Copyright © Huawei Technologies Co., Ltd.
4
Installation
Description
Prepared by the
customer
Prepared by the
customer
Purchased from
the Company
4 Installation
27

Advertisement

Table of Contents
loading

Table of Contents