LUNA2000-200KTL-H1 Smart Power Control System
User Manual
If Smart PCSs are installed on the DCBOX, bind the cables as shown in the
following figure.
Figure 5-23 Binding FE communications cables
----End
5.9 Closing the Maintenance Compartment Door
Precautions
● Before closing a maintenance compartment door, check that the cables are
● If a screw on the maintenance compartment door is lost, obtain a spare screw
5.9.1 Closing the DC Maintenance Compartment Door
Step 1 Adjust the support bar, close the maintenance compartment door, and tighten the
two screws on the door.
Issue 08 (2024-01-23)
NO TICE
connected correctly and securely, close the terminal block cover, and remove
any foreign object from the maintenance compartment.
from the accessory bag in the maintenance compartment.
Copyright © Huawei Technologies Co., Ltd.
5 Cable Connection
59