LUNA2000-200KTL-H1 Smart Power Control System
User Manual
Figure 4-17 Installing the Smart PCS
----End

4.8 DCBOX Mounting

Installation Description
Issue 08 (2024-01-23)
NO TE
After the Smart PCS is secured, you need to configure a DC power distribution cabinet by
yourself. For details about the specifications, contact local technical support engineers.
The DCBOX-9/5-H0 is purchased from the Company.
For details about the installation procedure, see the
User
Manual.
NO TE
● A maximum of five Smart PCSs can be installed on the top of the DCBOX. If less
than five Smart PCSs will be installed, install them from left to right. Otherwise,
the Smart PCS fasteners cannot be used.
● The installation method of all Smart PCSs is the same. Install the Smart PCS
according to the direction shown in the figure. This section uses one Smart PCS as
an example.