Panasonic PAW-160MAH3M Installation Instructions Manual page 81

Air handling unit kit
Table of Contents

Advertisement

b. On Section X6 of the main PCB (see diagram below), connect the digital inputs (DI) as
follows:
3. In order to activate the 0–10 V demand control mode for the external BMS, remove the bridge
between terminals "T/D1" and "T/D2" (X6.5 and X6.6) on section X6 on the AHU Kit's main PCB.
Make sure that all other jumpers remain intact.
4. In 0–10 V demand control mode, in order to achieve the default relation of voltage versus
capacity as shown in step 7, adapt the wiring on the AHU Kit's terminal connectors of section X6
as follows (see also →
Connect the positive pole ("+") to "AI1 (X6.3)" and the negative pole ("–") to "AI2 (X6.4)".
5. Close the AHU Kit enclosure again (see →
p.
40).
AHU Kit – Installation Instructions – 07/2023
● Heating start to COM and DI1
● Cooling start to COM and DI2
● Fan mode (free cooling) start to COM and DI3
● All DI contacts open = Stop
5.3 Terminal board layout, p.
55):
4.1.1 Installation of AHU Kit – MAH3/PAH3 – step 6,
Control
7
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Paw-280mah3mPaw-560mah3mPaw-280pah3m-1

Table of Contents