Mechanical Installation - ABB InCharge Terra AL2-40-240-T1-WC1R Installation Manual

Terra ac wallbox 40a / 48a / 80a level 2 charger
Table of Contents

Advertisement

TA B L E O F C O N T E N T S

Mechanical installation

Table 16: Preliminary requirements
Spirit level
Drill
Installation template
Anchors for the mounting holes
C
P R E V I O U S C H A P T E R
A
N E X T C H A P T E R
General mechanical installation procedure
Note: The mounting screws and Anchors that are
included in the delivery are serviceable for a brick
wall. If you want to mount the EVSE on a different
type of wall, contact your local representative of
the manufacturer, refer to section
and contact data
Prepare the holes for the mounting screws
Procedure
1. Hold the installation template (A) against the wall.
2. Make sure that the installation is level. Use the spirit level.
B
3. Mark the location for the mounting holes (B).
4. Drill the mounting holes (B).
Note: For the diameter of the holes, refer to
chapter
Technical data, page 32
Required ools for installation, page 16.
5. Insert the anchores for the mounting holes (C) in the
mounting holes.
Manufacturer
at the end of the document.
and section
19

Advertisement

Table of Contents
loading

Table of Contents