Required Tools For Installation - ABB InCharge Terra AL2-40-240-T1-WC1R Installation Manual

Terra ac wallbox 40a / 48a / 80a level 2 charger
Table of Contents

Advertisement

16
TA B L E O F C O N T E N T S
Installation
In the box
Elements
EVSE
QSG, ABB Terra AC Wallbox, Ready. Set. Charge
RFID card
Installation template
Anchors 0.39 x 3.14 in (10 x 80 mm)
Screws 0.23 x 2.95 in (6 x 75 mm)
with silicone washer
Mechanical lug
Cold pressed ring terminal, L1/L2
Cold pressed ring terminal, PE
0.23 x 0.314 in (6x8 mm) screw
L1-L2 cover
P R E V I O U S C H A P T E R
Number of copies
1
1
1
1
4
4
2
2
1
3
1
N E X T C H A P T E R

Required tools for installation

T20 security pin Torx driver
Allen wrench set
Tape measure
Power drill
Drill bit, 25/64 in. (10 mm)
Wire cutter
Wire stripper
Crimp tool
Torque driver (50 lbf. in, 5.7. Nm)
Optional Smartphone with Bluetooth
Hamer
Spirit level
Slotted screwdriver
Philips P3 screwdriver

Advertisement

Table of Contents
loading

Table of Contents