General Installation Procedure - ABB InCharge Terra AL2-40-240-T1-WC1R Installation Manual

Terra ac wallbox 40a / 48a / 80a level 2 charger
Table of Contents

Advertisement

TA B L E O F C O N T E N T S

General installation procedure

Table 10: Preliminary requirements
All required permits to agree with the local rules are granted
The AC input cable is available
Tools for installation
There is no voltage on the AC input cable during the complete
installation procedure
Procedure
1. Unpack the EVSE
2. Prepare the site. Refer to chapter
page 18.
3. Do the mechanical installation. Refer to section
mechanical installation procedure, page 19.
4. Do the electrical installation. Refer to section
electrical installation procedure, page 21.
5. Install the cabinet cover.
6. Do the commissioning procedure. Refer to chapter
General commissioning procedure, page 28.
P R E V I O U S C H A P T E R
Site preparation,
General
General
N E X T C H A P T E R
Unpack the EVSE
1. Open the box.
2. Take out the EVSE and including parts like QSG
from the box.
3. Remove all packaging material from the EVSE.
4. Discard the packaging material.
5. Make sure that all parts are delivered according to the
order. Refer to the order and section
previous page.
6. Do an inspection of the EVSE and the parts for installation
for damage.
7. If you find damage or the parts are not according to the
order, contact the local representative of the
manufacturer (ABB E-mobility B.V.) refer to section
Manufacturer and contact data at the end of the
document.