3.3 Line (LC, ELC, DLC Card) Connection Test (via FCCS)
Perform the Line (LC, ELC, DLC Card) connection test, following the procedures listed below.
3.3.1
Line Origination Test: Confirmation of Physical/Telephone STN Number
STEP 1: Connect the line circuit card to be tested to a telephone set in Node A (self-Node).
STEP 2: Lift the handset of STN A and confirm DT (Dial Tone).
STEP 3: Place a call to an ATTCON or D
STEP 4: Answer the call and confirm the speech condition and Physical/Telephone (station) number of the
calling station.
STEP 5: Release the call.
3.3.2
Line Termination Test: Confirmation of Telephone STN Number
STEP 1: Place a call from ATTCON/D
STEP 2: Answer the call.
STEP 3: Confirm the number dialed and that the Telephone Number of STN A are the same on the display of
the ATTCON/D
STEP 4: Release the call.
3.3.3
Line Connection Test: Case of Hot Line/House Phone Involved
STEP 1: The Station to be tested goes off-hook and confirms Ring Back Tone (RBT).
STEP 2: Check whether the call is routed to the predetermined station/ATTCON.
STEP 3: Answer the calls and confirm the speech condition.
STEP 4: Release the call.
Node A (Self-Node)
STN A
LC /
ELC
Line to be tested
(XXXX)
Figure 6-10 Line Connection Test (origination) via FCCS
term
in Node B.
term
in Node B using the Telephone Number of STN A.
term
.
FCCS
ND-70185 (E)
Get other manuals https://www.bkmanuals.com
POST INSTALLATION TEST
FCCS Network Connection Test
Node B
ATI
ELC
Check
Check
Check
ATTCON
term
D
CHAPTER 6
Page 141
Revision 3.0