GE Multilin GEK-113328A Instruction Manual page 138

Generator protection & control system
Table of Contents

Advertisement

5.2 BOOT CODE UPGRADE
5 BOOTCODE AND FIRMWARE UPGRADE
After accepting to proceed, a window will open up for selecting a temporary IP Address. It is advisable to set the IP Address
that is going to be used lately in the relay for Ethernet connection.
Figure 5–7: TEMPORARY IP ADDRESS SELECTION FOR BOOT UPGRADE
After entering the temporary IP address, a window will open up for selecting the appropriate file from the Multilin web site or
Product CD.
5
Figure 5–8: BOOT FILE SELECTION
Once the appropriate boot program file has been selected, the program will proceed to load the selected file.
Figure 5–9: LOADING BOOT FILE
5-6
G650 Generator Protection & Control System
GEK-113328A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multilin g650

Table of Contents