Installation

IMPORTANT: Installers and End Users must read and understand the content
of this manual before installation and/or use of the product.
Installation must only be performed by someone who is properly qualified and
competent to do so in accordance with the current legislation in force in the
geographical location of the installation.
Advice provided in this manual does NOT override any legislation.
Rolec Services Ltd cannot accept any responsibility for improper installation or any
problems arising from improper installation.
NOTE: Damage to the equipment, connected systems or to property caused by
improper installation are the responsibility of the installer.

BEFORE Installation

IMPORTANT: Signal Strength
Units that use mobile networks to communicate with a cloud-based back office contain
a roaming SIM card that connects to the strongest signal available.
It is assumed that a suitable mobile network signal has already been verified by the end
user/installer prior to installation.
Units using mobile networks require a suitable signal of 14 CSQ or better.
Units using Wi-Fi connectivity require a strong, stable connection.
Rolec cannot be held responsible or accountable in the event that a unit using a
mobile network or Wi-Fi is installed in a location without adequate network signal.
CAUTION: Equipment Damage – Sensitive Equipment
If you will be performing insulation resistance tests on the power supply cables, it is
advised to be done BEFORE connecting the power cable to the chargepoint. The high
voltages applied during the test may damage sensitive components if tested after the
cable is connected.
1. Establish a suitable site location for the unit that is both secure and environmentally
safe.
Make sure the mounting location meets current legislation (if applicable).
Where a chargepoint with a tethered cable will be used, consider where the
chargepoint, and the cable and plug holster will be sited.
Where possible, choose a location that provides some shelter from extremes of
weather. Whilst the chargepoint (and associated equipment) meets or exceeds
the required standards, a sheltered location will provide additional protection
and make the chargepoint more pleasant to use.
If wall mounting will not be used, prepare the site by installing a mounting post.
EVWM-V01-R1 Installation and Operation Manual
December 2022
Installation
WallPod Intelligent EV Charging Unit
Page 16 of 35

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WALLPOD ROLEC4020G and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Wallpod rolec4020wWallpod rolec4020bWallpod rolec4140gWallpod rolec4140wWallpod rolec4140bWallpod rolec4145g ... Show all

Table of Contents

Save PDF