Power Supply Condition; Power-On Sequence; Power-Off Sequence - Mitsubishi Electric KD Series User Manual

Contact image sensor for web surface inspection
Hide thumbs Also See for KD Series:
Table of Contents

Advertisement

4-4 Power supply condition

4-4-1 Power-ON sequence

V
(24V)
LED
Vdd(5V)
Internal reset signal
内部リセット信号
180ms
610ms
リセット
Reset period
ASIC boot period
ASICブート期間
期間
電源OFF
Power-OFF
ON
FPGA configuration period
FPGA boot period
FPGA コンフィグレーション期間
FPGAブート期間
1000ms
Wait 1.2 seconds after charging 5V

4-4-2 Power-OFF sequence

TM-XG537C
4.7V以下
Dark output
LED-ON available
LED点灯可能
暗出力
available
取込可能
(画像読取動作可能)
(scanning available)
125ms
COPYRIGHT © 2020 MITSUBISHI ELECTRIC CORPORATION. ALL RIGHTS RESERVED.
【 Power-ON sequence 】
1)
Power-ON sequence described on the left is
recommended to start up this product appropriately.
(Although operations other than the recommended does
not damage the product, but it may illuminations shine
strongly moment.)
2)
After rising up 5V power supply ( more than 4.8 V),
wait for 1.2 seconds and start charging 24V power
supply. Initial boot is completed in 1.2 seconds after
rising up of 5V power supply.
3)
Read Status register "XBOOT" in order to monitor
whether initial boot is completed or not. For more
details, refer to Chapter 5-2 Setting (others): Software
boot function.
【 Power-OFF sequence 】
1)
Start shutting down of power supply after finishing
communication control.
2)
Power-OFF sequence described on the left is
recommended to shut down this product appropriately.
(Although operations other than the recommended does
not damage the product, but it may illuminations shine
strongly moment.)
3)
After 24V power supply falls into less than 5V, start
shutting down 5V power supply.
【 Remark 】
1)
Each timing of Power-ON and Power-OFF depends
on the performance of your power supply. Make sure
the timing of power supply before starting to use.
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents