Before performing a capacity test, ensure that:
● The active power of the UPS is greater than 20 kW.
● (Total power of SmartLi cabinets in the system – Power of a single SmartLi) >
● The UPS is working in normal mode; float charging has lasted for 5 minutes
● The UPS generates no battery overtemperature, overvoltage, or overcurrent
● The mains, batteries, charger, and discharger are normal. No overload alarm is
● The SmartLi generates no alarms related to lithium batteries.
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Group Capacity Test to start a group capacity test.
Figure 7-13 Starting a group capacity test
----End

7.6.3 Downloading the Test Data

Issue 02 (2021-04-22)
NO TICE
UPS active power x 110%.
after the SOC of batteries reaches 100%; the load fluctuation of the system is
less than 20%.
alarm. No generator is connected to the UPS.
generated.
NO TE
The group capacity test automatically stops in any of the following cases:
● The minimum cell voltage reaches 2.75 V.
● The load fluctuation exceeds 20%.
● An alarm is generated.
The test is complete when the minimum cell voltage reaches 2.75 V. The test data is
obtained from the group capacity test. Save the test data obtained from the latest 36 tests.