Step 2 Tap Start on the right of Capacity Test to start a capacity test.
Figure 7-12 Starting a capacity test
----End

7.6.2.3 Performing a Group Capacity Test

Context
If multiple SmartLi cabinets are connected in parallel, discharge each SmartLi one
by one. (When a SmartLi is fully discharged, charge the SmartLi until its SOC
reaches 100%, and then discharge the next SmartLi until all SmartLi cabinets are
fully discharged.) A deep discharge test is conducted to obtain the battery
discharge performance data.
Issue 02 (2021-04-22)
NO TE
The capacity test automatically stops in any of the following cases:
● The minimum electrochemical cell voltage reaches 2.65 V.
● The load fluctuation exceeds 10%.
● An alarm is generated.
The test is complete when the minimum cell voltage reaches 2.65 V. The test data is
obtained from the capacity test. Save the test data obtained from the latest 36 tests.