Figure 7-6 ECO specifications
Step 3 (Optional) If you set ECO mode in bypass mode, manually start the UPS inverter.
After the inverter is started, the UPS still works in bypass mode, and the inverter is
on standby. When the bypass is abnormal, the UPS transfers to inverter mode
immediately. If the inverter is not started, the UPS stops supplying power when
the bypass is abnormal, and the system may power off.
Figure 7-7 System status in ECO mode
----End

7.6 Testing Batteries

7.6.1 Lead-Acid Battery Test

7.6.1.1 Performing a Forced Equalized Charging Test

Context
This item allows you to perform equalized charging on batteries forcibly.
Issue 02 (2021-04-22)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
7 Single UPS Commissioning
116

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-h-800kva

Table of Contents