SAR-Hm and SAR-Hmc Chassis Installation Guide

3.8 Chassis Installation Process

3.8.1 Preparation

Step 1. Review all regulations. See
Step 2. Assess and prepare the site and observe all safety warnings. See

3.8.2 Pre-staging

This section applies only if you are using ADP-Hm to initialize and commission the
7705 SAR-Hm or 7705 SAR-Hmc in a pre-staging facility.
Note: The instructions in this guide assume that the prerequisites for the instantiation of
ADP-Hm have been completed. Refer to the 7705 SAR-Hm and 7705 SAR-Hmc Main
Configuration Guide for more information.
To pre-stage the 7705 SAR-Hm or 7705 SAR-Hmc chassis, perform the following
steps in order:
Step 1. Unpack the chassis at the pre-staging facility. See
Step 2. Install the SIM. See
Step 3. Install the chassis on a table top. See
Step 4. Ground the chassis. See
Step 5. Connect the antenna and network cables to the chassis. See
Step 6. Prepare the DC input power cables and connections to the DC power feed.
Step 7. Power up the system and monitor ADP-Hm. See
Step 8. Shut down all power to the router.
Step 9. Remove the power cables from the router.
Step 10. Remove the antennas and cabling from the router. Do not remove the SIM.
3HE 17810 AAAA TQZZA
Preparation.
Installing the
Surface.
Indoor Antenna Connections to the 7705 SAR-Hm
Connections to the RJ-45
See
Preparing the DC Power
High Voltage Power Supply
Initializing.
© 2022 Nokia. Nokia Confidential Information
Use subject to agreed restrictions on disclosure and use.
7705 SAR-Hm and 7705 SAR-Hmc Overview
Mandatory
Regulations.
SIM.
Mounting the Chassis on a Flat
Grounding the
Chassis.
Ports.
Connections. If the HV-PS35 is used, see
Unit.
Site
Unpacking the
Chassis.
Making
and
Making
Powering Up and
79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7705 sar-hmc

Table of Contents