Download Print this page

NEC SL2100 Hardware Manual page 77

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
4.
Loosen the screw from the Fuse Unit.
5.
Slide Fuse Unit out of the Battery box.
6.
Replace the fuse (250VT8AL).
7.
Using the Fuse Unit guides, slide the Fuse Unit into the Battery Box.
INSTALLING THE EXTERNAL BACKUP BATTERY
Screw
Figure 2-52 Loosen the Fuse Unit Screw
Fuse Unit
250VT8AL
Fuse
Fuse Unit guide
Figure 2-53 Replacing the Fuse
Fuse Unit
Fuse Unit guide
Figure 2-54 Install the Fuse Unit
Fuse Unit
SL2100
75

Advertisement

loading