Download Print this page

NEC SL2100 Hardware Manual page 68

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
13. Plug the Battery Connection Cable into the Fuse unit.
Figure 2-38 Connecting the Battery Connection Cable
14. Align tabs a to f to holes A to F on Battery Box. Slide the Front cover and tighten the two screws.
2.6 Mounting the IP4WW-Battery Box
The IP4WW-Battery Box can be installed on either the floor or wall. One Chassis can be mounted on
an IP4WW-Battery Box.
Floor-Mounting the IP4WW-Battery Box
Battery box can be mounted on the floor using the FM/WM Base-F, FM/WM Base-R and WM Support.
(Note: FM = Floor-Mount and WM = Wall-Mount)
INSTALLING THE EXTERNAL BACKUP BATTERY
Battery Connection
Cable
Fuse unit
Figure 2-39 Installation of Front Cover
SL2100
66

Advertisement

loading