Valve Clearance Adjustment - Polaris RANGER XP 900 2018-2019 Service Manual

Table of Contents

Advertisement

VALVE CLEARANCE ADJUSTMENT

NOTICE
Always inspect valve clearance prior to camshaft
installation or final engine assembly.
1. Reference
the
camshaft
markings made during disassembly. If installing new
camshafts or if camshafts were not marked, you can
reference the part number stamped on the end of the
shafts.
Intake Camshaft PN: 1204583
Exhaust Camshaft PN: 1204584
2. Lubricate the camshaft bearing journal surfaces with
Polaris PS-4 engine oil prior to installation.
3. Carefully install the camshafts into the cylinder head.
The PTO camshaft lobes
shown.
4. Carefully install the rear camshaft carriers onto the
camshafts. Carrier openings should face each other
when installed properly.
9929399 R01 - 2018-2019 RANGER XP/ CREW 900/1000 Service Manual
© Copyright Polaris Industries Inc.
5. Install the four bolts that retain each rear camshaft
intake
and
exhaust
6. Rotate the camshaft until the cam lobes above the
e
should face out as
7. Measure the valve clearance using a thickness
8. Repeat steps 6 and 7 until all eight valves have been
ENGINE / COOLING / HVAC SYSTEM
r
carrier
and
tighten
the
specification.
TORQUE
Camshaft Carrier Bolts:
7 lb-ft (10 Nm)
valves you are inspecting are facing up.
(feeler) gauge. Record the measurement if clearance
is out of specification.
MEASUREMENT
Intake Valve Clearance (cold):
.006 ± .002 in. (0.15 ± 0.05 mm)
Exhaust Valve Clearance (cold):
.010 ± .002 in. (0.25 ± 0.05 mm)
inspected.
bolts
evenly
to
3
3.93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger xp 1000 2018-2019Ranger crew 900 2018-2019Ranger crew 1000 2018-2019

Table of Contents