Valve Clearance Check / Adjustment - Polaris RZR 570 2013 Service Manual

Table of Contents

Advertisement

TORQUE
Cylinder Head Bolts:
Torque in Sequence for all steps
Step 1: 18 ft-lbs (25 Nm)
Step 2: 30 ft-lbs (40 Nm)
Step 3: Loosen all fasteners until they are
unseated
Step 4: 15 ft-lbs (20 Nm)
Step 5: 26 ft-lbs (35 Nm)
Step 6: Additional 180°
Step 7: Additional 180°
Torque The Outer M6 Head Bolts 89 ± 9 in-lbs
(10 ± 1 Nm)
9926813 R04 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.
ENGINE / COOLING SYSTEM
VALVE CLEARANCE CHECK /
ADJUSTMENT
NOTE
Always inspect valve clearance prior to camshaft
installation or final engine assembly.
1. Install the cam chain guides and cam chain before
camshaft installation (if removed) as outlined in this
chapter.
2. Reference the camshaft intake
markings made during disassembly. If installing new
camshafts or if camshafts were not marked, you can
reference the part number stamped on the end of the
shafts.
3. Lubricate the camshaft bearing journal surfaces with
Polaris PS-4 engine oil prior to installation.
4. Carefully install the camshafts into the cylinder head.
The camshaft lobes should face out.
5. Carefully install the camshaft carrier onto the
camshafts.
3
q
w
and exhaust
3.63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr 570 2014Rzr 570 2015Rzr 570 2016

Table of Contents