Camshaft Installation / Timing (900) - Polaris RANGER XP 900 2018-2019 Service Manual

Table of Contents

Advertisement

ENGINE / COOLING / HVAC SYSTEM
8. Torque
cylinder
head
specification.
TORQUE
Cylinder Head Bolts:
Step 1: 9 lb-ft (12 Nm)
Step 2: 26 lb-ft (35 Nm)
Step 3:Additional 180°
Outer M6 Head Bolts: 7 lb-ft (10 Nm)
3.84
bolts
in
sequence
to

CAMSHAFT INSTALLATION / TIMING (900)

If any valve train components were replaced, refer to
"Valve Clearance Adjustment"page 3.93 procedure
prior to this procedure.
1. Rotate the engine until the flywheel Top Dead Center
q
(TDC) mark
Crankshaft Position Sensor (CPS) mounting hole
This places the PTO cylinder at TDC for camshaft
installation.
IMPORTANT
DO NOT use the "V" mark located on the flywheel
opposite of the "I" mark. Only the "I" mark should be
used as a TDC reference.
2. Reference the intake and exhaust markings made
during disassembly. If installing new camshafts or if
camshafts were not marked, you can reference the
part number stamped on the end of the shafts.
Intake Camshaft PN: 1204583
Exhaust Camshaft PN: 1204584
9929399 R01 - 2018-2019 RANGER XP/ CREW 900/1000 Service Manual
NOTICE
is aligned or centered in the
© Copyright Polaris Industries Inc.
w
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger xp 1000 2018-2019Ranger crew 900 2018-2019Ranger crew 1000 2018-2019

Table of Contents