Install A Hot-Swap Power Supply - Lenovo ThinkSystem SR550 Maintenance Manual

Hide thumbs Also See for ThinkSystem SR550:
Table of Contents

Advertisement

Step 3.
Press the release tab toward the handle and carefully pull the handle at the same time to slide the
hot-swap power supply out of the chassis.
Notes: Slightly pull the power supply upwards when sliding the power supply out of the chassis, if
you have installed one of the following CMA kits:
• 2U CMA Upgrade Kit for Toolless Slide Rail
• Toolless Slide Rail Kit with 2U CMA
Figure 72. Hot-swap power supply removal
After removing the power supply:
• Install a power supply filler or a new power supply to cover the power supply bay.
Important: To ensure proper cooling during normal server operation, both of the power supply bays must
be occupied. This means that each bay must have a power supply installed; or one has a power supply
installed and the other has a power supply filler installed.
• If you are instructed to return the old power supply, follow all packaging instructions and use any
packaging materials that are provided.

Install a hot-swap power supply

Use this information to install a hot-swap power supply.
"Read the
installation
Guidelines" on
page 53
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply:
• The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be
shipped with two power supplies installed.
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 56
Chapter 3
.
Hardware replacement procedures
97

Advertisement

Table of Contents
loading

Table of Contents