Huawei RRU3203-B12 Installation Manual page 42

Table of Contents

Advertisement

RRU3203
Installation Guide
Figure 6-7 Hoisting fiber optic cables onto the tower
Before hoisting fiber optic cables onto the tower, connect the fiber optic cables to the RRU or
BBU based on the labels on both ends of the cables and determine the hoisting direction.
1.
2.
3.
4.
Step 3 Secure the fiber optic cables to the tower vertically using cable clips.
Step 4 Remove the lifting sling, traction sling, and protection pipe.
----End
Issue 06 (2012-04-16)
CAUTION
After climbing up to the tower, installation engineer A secures the fixed pulley to the tower
platform support and leads the lifting sling through the fixed pulley.
Place the fiber coiler for coiling fiber optic cables on the fiber spools, and bind the fiber
optic cables using the lifting sling and traction sling.
Installation engineer B rotates the fiber spools at the speed of 5 m (16.4 ft.) to 15 m (49.21
ft.) per minute to coil the fiber optic cables.
Installation engineer C pulls the lifting sling downwards, and installation engineer D pulls
the traction sling outwards to protect the fiber optic cables from colliding with the tower.
NOTE
The procedure for hoisting the fiber optic cables onto the tower is for your reference only.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Hoisting an RRU and Related Cables onto a Tower
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru3203Dbs3900Dbs3900 lte

Table of Contents