Figure 3-24: Ground Cable Connection To The Smps Assembly - Samsung 93PM Installation Manual

Table of Contents

Advertisement

.
3
Installing the Product
NOTICE
Connect a ground cable between the SMPS Assembly and the Rack Frame with an M5 x 10L
screw. (Torque: 5.1–6.1 Nm [50–60 kgf cm])
Verify that the torque setting is correct.
36

Figure 3-24: Ground Cable Connection to the SMPS Assembly

English 8/2020. Rev 0.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395c9395p9395

Table of Contents