Figure 3-21: Ground Cable Connection To The Smu - Samsung 93PM Installation Manual

Table of Contents

Advertisement

.
3
Installing the Product
NOTICE
Connect a ground cable between the SMU and the Rack Frame (SCREW M5 x 10L). (Torque:
5.1–6.1 Nm [50–60 kgf∙cm])
Verify that the torque setting is correct.
34

Figure 3-21: Ground Cable Connection to the SMU

English 8/2020. Rev 0.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395c9395p9395

Table of Contents