Preparation Stage-Procedure - Samsung 93PM Installation Manual

Table of Contents

Advertisement

.
3
Installing the Product
3.4 Preparation Stage—Procedure
For the preparation stage, perform the following steps:
1. Create the installation plan and check the equipment and instruments for installation.
2. Check the arrival schedule of the parts required.
3. Unpack the equipment.
4. Inspect the equipment.
WARNING
Do not wear watches, rings, jewelry, or any other metal objects.
Wear electrically insulated gloves and safety shoes.
CAUTION
Store the product in a dust-free place with the moisture level of below 60% and the
temperature level of 23°C ±5°C.
Keep components out of direct sunlight.
14
English 8/2020. Rev 0.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395c9395p9395

Table of Contents