Installation Procedure - Mitsubishi Electric CC-Link IE TSN FR-A8NCG Instruction Manual

Table of Contents

Advertisement

2.2

Installation procedure

 Installing the communication option LED display cover
(1) Remove the inverter front cover. (Refer to Chapter 2 of the Instruction Manual (Detailed) of the inverter for instructions for
removing the front cover.)
Follow instructions for mounting the communication option LED display cover to the inverter front cover.
(2) Cut off the tabs on the rear of the inverter front cover with nipper, etc. and
remove the separate part to make space for fitting the LED display cover.
(3) Fit the communication option LED display cover to the front side of the
front cover. Align the LED display cover with the LED position on the
circuit board of the option. Push the LED display cover until it is fixed with
the clips.
CAUTION
Take care not to hurt your hand and such with portions left by cutting tabs of the rear of the front cover.
14
INSTALLATION
Cut off the tabs with a nipper, etc.
Cut off the tabs with a nipper, etc.
Communication option LED display cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

800 series

Table of Contents