10 Appendix
f
Checking the DIP Switches
When the two PMUs are in the same monitoring line (MON0 or
and 4.
Check whether the PMU DIP status is
PMU
11 Change History
11 Change History
This describes the changes in the APM30H&TM
Installation Guide.
14 (2010-12-20)
This is the thirteenth commercial release.
Compared 14 with 13,
1. Add the description about the power cable for the junc
1 Add th d
i ti
Power Cables (-48 V DC)".
13 (2010-11-30)
This is the twelfth commercial release.
Compared 13 with 12,
1. Add the description about the SLPU in the chapter of
12 (2010-09-30)
This is the eleventh commercial release.
Compared 12 with 11,
1. Add the diameter specification of the metal pole on w
chapter of "Installing the Cabinets".
11 (2010-08-25)
This is the tenth commercial release.
Compared 11 with 10,
Compared 11 with 10
1. Update the power cable for the heater in the chapter o
2. Add the figure about mapping relationship between the
chapter of "Installing the Optional Modules".
b
t th
bl f
th j
MON1), the monitoring address of the PMUs must be set to 3
correct.
The monitoring address of the PMU is set to 3.
T
The monitoring address of the PMU is set to 4.
T
MC11H&IBBS200D&IBBS200T(Ver.B)
ction box in the TMC11H in the chapter of "Installing the
ti
b
i th TMC11H i th
"Installing the Optional Modules".
hich the Apm30H and TMC11H are installed in the
of "Installing the Optional Modules".
e pins in the input and output ports on the USLP2 in the