PHASE 2 - TRANSMITTER INSTALLATION
Pressure or absolute pressure measurement of a liquid in
a pipe
1. Place the tap at the side of the line.
2. Mount the transmitter beside or below the tap for clean
fluids, above the tap for dirty fluids.
3. Connect the transmitter to the pipe.
Pressure or absolute pressure measurement of a
condensable vapor in a pipe
1. Place the tap at the side of the line.
2. Mount the transmitter below the tap.
3. Connect the transmitter to the pipe.
4. Fill the vertical section of the connecting line to the tap with
a compatible liquid through the dedicated filling tee.
Pressure or absolute pressure measurement of a gas in a
pipe
1. Place the tap at the top or side of the line.
2. Mount the transmitter beside or above the tap.
3. Connect the transmitter to the pipe.
- 8 -
Dirty fluids
E
gate valve
S
gate
valve
Clean
fluids
filling
tee
vent
valve
gate
valve