Figure 39. Installing the upper C-channel
① Have one person hold and align the C-channel between the upper rack EIA flanges.
② Secure the front end of the C-channel to the front EIA flange with one M5 x 20 mm screw
through the left most hole in the channel.
③ Secure the rear end of the C-channel to the rear EIA flange with two M5 x 20 mm screws
through the right and left most holes in the bracket.
Do NOT over-tighten the screws as the rack EIA flange could be deformed.
Step 5.
Rotate the server 90 degree clockwise so that the right side is facing down.
34