Chapter 6. Installing optional kits

See this section to learn how to install optional kits for ThinkSystem Micro DataCenter 6U 1200mm Deep
Rack Cabinet.

Installing the rail kits

Follow the instructions in this section to install or remove the rail kits and servers.
This cabinet supports the following servers and corresponding rail kits. Follow the instructions to install them
into the cabinet.
• "Install the rail kit and SE350 E1 Enclosure (1U2N)" on page 19
• "Install the rail kit and SR250" on page 25
• "Install the rail kit and SR670" on page 30

Install the rail kit and SE350 E1 Enclosure (1U2N)

A A b b o o u u t t t t h h i i s s t t a a s s k k
See the following table to identify the components that come with the rail kit.
1
Document
2
Left rail
The cabinet supports up to four units of rail kit and SE350 E1 Enclosure and corresponding rail kit. For
optimal use of space, it is advised to determine the location to install the rail kits based on the number of
units that are installed.
• One unit: 3U
• Two units: 3U and 4U
• Three units: 3U, 4U, and 5U
• Four units: 3U, 4U, 5U, and 6U
Note: When installed vertically into this cabinet, the server can be installed with server top facing either right
or left. In this section, however, it is illustrated with the top of server facing right as an example.
P P r r o o c c e e d d u u r r e e
Step 1.
Remove the inner rails.
© Copyright Lenovo 2020
3
Right rail
4
Two M6 screws
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d2c7d2p

Table of Contents