Using Top Clamp For Bundle Cutting - Sharp SW-120NC Instruction Manual

Table of Contents

Advertisement

USING TOP CLAMP FOR BUNDLE CUTTING 
 
Installing top clamp 
To perform bundle cutting, use the top clamps and take the following installation procedures. 
 
Step 1 – Install stud bolts on the front and rear vises and position the top clamp. 
Step 2 – Connect the top clamp hoses to the pressure joints on the vise hydraulic cylinders. 
Step 3 –  Position the workpiece for bundle cutting.  
 Note the allowable clamping width and height. (Refer to Section 2 – General Information, 
Specifications) 
 
                                  Proper 
                               
 
        
Step 4 –  Align the top clamp cylinders with the center of the workpiece and tighten the lock nuts. 
Step 5 –  Turn the top clamp handles so that the clearance between the top clamp jaw and the top of 
the bundled workpiece is within 5 to 10 mm ( 0.2 ~ 0.4 inch).  
Step 6 –  Install the bundle‐cutting fence to the work tray. The fence is designed to prevent cut pieces 
 
Proper and improper stacking of workpieces 
       
   
 
                                 Improper 
               
           
 
             
 
 
 
 
4‐29 

Advertisement

Table of Contents
loading

Table of Contents