Lifting - Sharp SW-120NC Instruction Manual

Table of Contents

Advertisement

LIFTING

When moving the machine, we strongly suggest you choose any one of the methods described below
to move your machine.
1. Use a crane
Move the machine to its location by using a crane and a wire rope sling that can fully withstand the
weight of the machine (refer to machine specification under Section 2 General Information).
Machine lifting is likely to damage the machine
if not performed properly.
You must have a qualified crane operator
to perform the job.
You must use tools and equipment with the
proper tensile strength and use proper method
when moving your machine.
Apply the wire rope sling to the lifting hooks on
the four ends of the machine.
Slowly lift the machine. Be sure to protect the
machine from impact or shock during this
procedure. Also watch out your own fingers
and feet to avoid injuries.
Keep the machine well balanced during lifting
process and make sure the wire rope does not
interfere with the saw frame.
When you work together with more than two
people, it is best to keep constant verbal
communication with each other.
3-3

Advertisement

Table of Contents
loading

Table of Contents