Bosch Rexroth lndraControl VPB 40.1 Project Planning Manual page 64

Control cabinet pc
Table of Contents

Advertisement

62/81
Bosch Rexroth AG
Software
Configuration
Service has been started, but is not ready for operation yet
Service is in operation
Service is in operation, however errors have been indicated during the
start (battery, temperature, fan and voltage errors)
Fig.9-2:
Indication of the operating status of the service in the Windows task bar
In the service manager of Windows the status of the UPS NT service is indi‐
cated:
UPS NT stopped: No entry in the status column
UPS NT started: Entry Started is displayed as status
Click on the Start or Stop buttons to start or stop the marked entry UPS NT
Service.
Fig.9-3:
Services window
To configure the UPS NT program, select UPS NT Control in the control panel,
see
fig. 9-4 "Symbol UPS NT Control in the Windows Control Panel" on page
63.
NOTICE
The UPS NT program always runs as a Windows NT service. Changing the
user does not influence this behavior. The user cannot terminate the program
or stop the monitoring without administrator rights.
DOK-SUPPL*-VPB*40.1***-PR02-EN-P
Rexroth IndraControl VPB 40.1 Control Cabinet PC
Closing the program or stopping the monitoring
is not possible due to missing administrator
rights.

Advertisement

Table of Contents
loading

Table of Contents