Bosch Rexroth lndraControl VPB 40.1 Project Planning Manual page 54

Control cabinet pc
Table of Contents

Advertisement

52/81
Bosch Rexroth AG
Maintenance and Installation
1
X19
Replacing the battery pack
4. Switch off the supply voltage for the VPB 40.1. If required, unplug all con‐
nectors from the VPB 40.1.
5. Connect the 2-pin battery cable to interface X19 of the operator terminal.
The original cable is reverse voltage protected.
X20
X19
XDP
XCOM3
1
1
F1
X10
XCOM1
S1
XCOM2
Fig.8-7:
Position and pin assignment of the battery connection
DANGER
Ensure that the polarity of the battery is correct. In the case of a polarity reversal
of the battery a F10A (5x20) fuse is released on the power supply unit. Notes
on the replacement of the fuse are given in
Fuses" on page
56.
1. Switch on the supply voltage for the VPB 40.1 again.
2. Observe the illuminated symbol "UPS" on the front panel of the connected
VDP:
UPS illuminated symbol off: Batteries already charged
UPS illuminated symbol flashes red: Batteries discharged
Wait approximately 5 hours until the batteries are charged and the
UPS symbol extinguishes.
NOTICE
Therefore use charged batteries, if possible. The charging time of a 2.5 Ah
battery is approximately 5 hours.
The battery pack must be replaced in the following cases:
The battery test failed during system boot.
The number of charging cycles exceeds the value depending on the sur‐
rounding air temperature and specified in
53.
The red illuminated symbol "UPS" on the VDP front panel flashes longer
than eight hours.
DOK-SUPPL*-VPB*40.1***-PR02-EN-P
Rexroth IndraControl VPB 40.1 Control Cabinet PC
A3
A2
A1
XMouse
XUSB1
1
XUSB2
XEthernet XKeyb.
XLPT1
XVGA
1
VI Vo T UPS HD
1
X71
X39
chapter 8.6 "Exchanging the
Insufficient UPS protection for controlled shut‐
down of the PC during the charging time if the
new battery pack is not yet charged.
"Charging cycles" on page

Advertisement

Table of Contents
loading

Table of Contents