GE MobileLink CB-1000 Installation And Troubleshooting Manual page 20

Wireless communications for ecg
Table of Contents

Advertisement

16
Installation Procedures
10. Re-connect the power cable to the 5VDC connector on the client
bridge.
11. Loop the power cable and the communications together through the
nylon strain relief as shown below.
12. Tighten the strain relief and mount it to the bracket with the screw
removed in step 5.
127(
When properly assembled, you should have approximately 11"
from the strain relief to the end of the communications cable.
13. Slide the client bridge bracket assembly onto the MAC 5000 report
tray as shown below.
Sliding Client Bridge Bracket Assembly onto Report Tray
MobileLink
2002783-060
19B
Revision D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents