GE MobileLink CB-1000 Installation And Troubleshooting Manual page 18

Wireless communications for ecg
Table of Contents

Advertisement

14
Installation Procedures
3. Remove the three mounting screws which hold the client bridge/
power supply assembly to the bracket (two screws from the power
supply and one which holds the nylon strain relief to the bracket).
Discard the nylon strain relief. Set the three screws aside.
Remove three
mounting screws.
4. Unsnap the client bridge from its mounting plate. Remove client
bridge/power supply assembly from bracket and disconnect the
power cable from the 5VDC connector on the client bridge.
5. Replace the two screws which were removed in step 3 into the power
supply housing. Remove the other two screws (diagonally opposite
from the two screws just replaced) and set aside along with the screw
for the strain relief. They will be needed later when mounting this
assembly to the original style bracket.
6. Remove the client bridge mounting bracket by unscrewing the two
mounting screws which hold it to the bracket.
MobileLink
2002783-060
client bridge
mounting
bracket
mounting
screws
37A
Revision D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents