Download Print this page

Toro 2226 Quick Start Manual page 31

Directional drill
Hide thumbs Also See for 2226:

Advertisement

Adjusting the TJC-spray Volume
To adjust the volume of thread-joint compound that is
delivered by the applicator, complete the following:
1. Loosen the jam nut on the adjustment bolt located on
top of the TJC-applicator piston
1
Figure 34
1. Adjustment bolt
2. Jam nut
2. Adjust the bolt as follows:
To increase the applied volume of compound,
thread the bolt out (up).
To decrease the applied volume of compound,
thread the bolt in (down).
3. When you have attained the desired application volume,
tighten the jam nut to secure the adjustment.
(Figure
34).
2
3
g021845
3. TJC-applicator piston
Filling the TJC Applicator
1. Stop the machine and stop the engine.
2. Open the stake-down-guard door.
3. Loosen the wing nuts securing the cover straps to the
machine
(Figure
1
5
g021845
1. TJC-applicator piston
2. Cover
3. Strap
4. Rotate the cover and pull the cover straps off the
retaining bolts
5. Lift the cover assembly off and out of the empty
thread-joint-compound bucket
6. Replace the empty bucket with a new full bucket.
7. Place the plunger into the new bucket and lower the
cover assembly onto the bucket
8. Slide the cover straps over the retaining bolts and rotate
the cover to seat the straps on the bolts
9. Tighten the wing nuts.
Moving a Disabled Machine
Whenever the machine is stopped and the engine is not
running, the hydrostatic brakes automatically engage. Do not
attempt to tow the machine if it cannot move under its own
power. If possible, repair the machine at the site. If this is not
possible, use a crane and a spreader bar to lift the machine
onto a trailer, using the lift points.
31
35).
g021846
Figure 35
4. Wingnut
5. TJC bucket
(Figure
35).
(Figure
35).
(Figure
35).
(Figure
2
3
4
g021846
35).

Advertisement

loading

This manual is also suitable for:

23803