Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
Description
No parts required
No parts required
inch)-for 2019 and after electric
Qty.
-
Prepare the machine.
Remove the strut assembly (for 2018
-
and before machines only).
Install the springs (for 2018 and before
2
machines only).
Install the strut assembly (for 2018 and
-
before machines only).
2
16
16
1
Install the supports.
1
4
4
4
1
1
1
4
4
4
2
Install the cab.
1
1
1
2
6
6
6
1
2
Route the wire harness.
2
2
1
3
Use