Install The Top Cover - Lenovo ThinkSystem SR550 Setup Manual

Hide thumbs Also See for ThinkSystem SR550:
Table of Contents

Advertisement

Figure 54. Connecting the RAID super capacitor module to the RAID adapter

Install the top cover

Use this information to install the top cover.
"Read the
installation
Guidelines" on
page 46
S033
CAUTION:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with
metal, which might result in spattered metal, burns, or both.
S014
CAUTION:
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is
authorized to remove the covers where the label is attached.
Before installing the top cover:
1. Ensure that all cables, adapters, and other components are installed and seated correctly and that you
have not left loose tools or parts inside the server.
2. Ensure that all internal cables are correctly routed. See "Internal cable routing" on page 28.
To install the top cover, complete the following steps:
Watch the procedure. A video of the installation process is available:
• YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-C9jFjZnXQ6AmTXaIdX6_HJ
ThinkSystem SR550 Setup Guide
84
"Power off
the server
for this task"
on page 90
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 48

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents