Figure 48. M.2 retainer adjustment
Step 1.
Press both sides of the retainer
Step 2.
Move the retainer forward until it is in the large opening of the keyhole.
Step 3.
Take the retainer out of the keyhole.
Step 4.
Insert the retainer into the correct keyhole.
Step 5.
Press both sides of the retainer.
Step 6.
Slide the retainer backwards until it is seated in place.

Install a hot-swap power supply

Use this information to install a hot-swap power supply.
"Read the
installation
Guidelines" on
page 46
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply:
• The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be
shipped with two power supplies installed.
• Ensure that the devices that you are installing are supported. For a list of supported optional devices for
the server, go to
http://www.lenovo.com/us/en/serverproven/
Notes:
• Ensure that the two power supplies installed on the server have the same wattage.
• If you are replacing the existing power supply with a new power supply of different wattage, attach the
power information label that comes with this option onto the existing label on the top cover near the
power supply.
ThinkSystem SR550 Setup Guide
78
.
1
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 48
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents